摘要
通过马来西亚50000m^3转炉煤气柜的施工,分析了煤气柜施工的特点和难点以及橡胶膜安装过程中容易出现的问题,提出了橡胶膜安装的具体步骤及注意事项,以加大施工企业对橡胶膜安装过程质量控制的重视力度,从而减少或避免类似问题的出现。
Through the construction of the 50 000 m^3 converter gas tank in Malaysia, the characteristics and difficulties of the construction of the gas tank and the problems which were easy to occur during the installation of the rubber membrane were analyzed. The specific steps and precautions for the installation of the rubber membrane were put forward to increase the attention of construction companies to the quality control of the rubber membrane installation process, thereby reducing or avoiding the occurrence of similar problems.
作者
刘士锋
LIU Shifeng(Beijing Shougang Construction Group Co.,Ltd)
出处
《首钢科技》
2018年第4期24-27,共4页
Shougang Science and Technology
关键词
煤气柜
橡胶膜
施工
gas tank
rubber membrane
construction