马来西亚50000m^3转炉煤气柜橡胶膜的安装

Installation of Rubber Membrane for 50 000 m^3 Converter Gas Tank in Malaysia
下载PDF
导出
摘要 通过马来西亚50000m^3转炉煤气柜的施工,分析了煤气柜施工的特点和难点以及橡胶膜安装过程中容易出现的问题,提出了橡胶膜安装的具体步骤及注意事项,以加大施工企业对橡胶膜安装过程质量控制的重视力度,从而减少或避免类似问题的出现。 Through the construction of the 50 000 m^3 converter gas tank in Malaysia, the characteristics and difficulties of the construction of the gas tank and the problems which were easy to occur during the installation of the rubber membrane were analyzed. The specific steps and precautions for the installation of the rubber membrane were put forward to increase the attention of construction companies to the quality control of the rubber membrane installation process, thereby reducing or avoiding the occurrence of similar problems.
作者 刘士锋 LIU Shifeng(Beijing Shougang Construction Group Co.,Ltd)
出处 《首钢科技》 2018年第4期24-27,共4页 Shougang Science and Technology
关键词 煤气柜 橡胶膜 施工 gas tank rubber membrane construction
  • 相关文献

参考文献2

二级参考文献4

  • 1王清训,李慧民,杨俊保,等.机电工程管理与实务[M].北京:中国建筑工业出版社,2013.
  • 2丁士昭.建设工程项目管理[M].北京:中国建筑工业出版社.2013.
  • 3谷中秀.橡胶模型干式煤气柜[M].北京:冶金工业出版社,2010.
  • 4刘素,刘伟冲,陈建锋,李双锁,张丽珍.干式气柜安装的关键环节[J].石油工程建设,2010,36(2):37-39. 被引量:4