摘要
文章重点研究恢复人形河行洪可能性和可行性,对人形河与柏年河现状断面以及未来河势演变情况合理分析,对拟定的疏浚、分流比方案进行水位试算,选取合适的分流比。
This paper focuses on the possibility and feasibility of Rehabilitation of the Bifurcation River floods,analyses the reasonable of the Bifurcation River,the cross-section of the Bainian River and the evolution of the river regime in the future.The proposed dredging and diversion ratio scheme will be used for water level trials to select the appropriate diversion ratio.
作者
王利军
王丽娟
WANG Li-jun;WANG Li-juan(Anhui Survey and Design Institute of Water Conservancy and Hydropower Hefei 230088,China;Anhui Technical College of Water Resoueces and Hydroelectic Power,Hefei 231603,China)
出处
《安徽水利水电职业技术学院学报》
2018年第3期12-13,共2页
Journal of Anhui Technical College of Water Resources and Hydroelectric Power
关键词
分叉型河流
疏浚
分流比
bifurcated river
dredging
diversion ratio