摘要 盾构法施工过程中地表沉降过大会影响盾构隧道的正常使用和安全运营,特别是在建筑物、地下管线密集的情况下,隧道施工引起的地表沉降更应引起高度重视。论文通过深入分析富水砂层中盾构施工造成的地表严重沉降事件,提出了针对性的控制措施,为同类地层条件中盾构施工提供参考依据。 In the shield construction process, if the ground settlement is too large, will affect the normal use of the shield tunnel and safe operation, especially in the condition that the buildings and underground pipelines are dense, surface subsidence caused by tunnel construction should arouse our attention. Through in-depth analysis of the serious surface subsidence events caused by shield construction in the water rich sand layer, some pertinent control measures are put forward to provide reference for shield construction in similar stratum conditions
作者 毕景佩 罗宇勤 BI Jing-pei;LUO Yu-qin(Zhengzhou Metro Group Co.Ltd.,Zhengzhou 450000,China;Zhejiang East China Project Safe Technology Co.Ltd.,Hangzhou 310000,China)
出处 《工程建设与设计》 2018年第18期42-43,共2页 Construction & Design for Engineering
关键词 盾构法 富水砂层 地表沉降 土体改良 控制措施 shield method water rich sand layer surface settlement soil improvement control measures
  • 相关文献

参考文献3

二级参考文献20

共引文献7

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部