城市燃气管道工程进度风险管理 被引量:1

Progress Risk Management of Urban Gas Pipeline Construction Project
下载PDF
导出
摘要 在社会经济不断发展的背景下,人们对工程项目的要求越来越高,城市燃气管道工程对燃气的正常输送有重要的意义,同时,由于城市燃气管道工程规模较大,工期紧张,因此,施工中要加强进度管理,规避风险,保证城市燃气管道工程的顺利完工。为此,论文对城市燃气管道工程的施工特点、影响施工进度的风险以及进度风险管理措施进行分析,以期为相关人员提供参考,保证工程的施工进度。 Under the background of continuous development of social and economic, people put higher and higher demanding on the engineering project, the city gas pipeline project is of great significance to the normal transportation of the gas, at the same time, the city gas pipeline construction project has large scale and long construction period, so we need to strengthen process management to avoid the risk of progress, and ensure the successful completion of the city gas pipeline project. Therefore, the article will analyze the construction characteristics, risk of construction progress and risk management measures for urban gas pipeline construction, so as to provide references for relevant personnel and ensure the progress of project construction.
作者 曹阳 CAO Yang(Kunlun Energy Company Limited,Beijing 100101,China)
出处 《工程建设与设计》 2018年第18期235-236,共2页 Construction & Design for Engineering
关键词 城市燃气管道 基建工程 进度风险 管理措施 urban gas pipeline infrastructure project progress risk management measures
  • 相关文献

参考文献2

二级参考文献9

共引文献8

同被引文献1

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部