摘要 分析研究RH冶炼周期的极限性环节和LF吨钢电耗及电极消耗高的影响因素,通过钢包全程加盖,优化脱碳工艺,改变硅钢加料方式,优化通电档位、提高新钢包烘烤效果、优化渣料加入量等各类攻关,RH平均冶炼周期从34 min降低到28.3 min,具备月产15万t能力;LF电极消耗从0.37 kg/t降至0.29 kg/t,电耗降低5.36 kWh/t,直接经济效益1 966.93万元,取得较好经济效益. In this paper, the limited links of RH smelting cycle and the factors in high electricity and electrode consumption of LF per ton steel were investigated. The average smelting period of RH reduced from 34 minutes to 28.3 minutes, with a capacity of 15000 tons per month, through ladle covering in all processes, changes of feeding mode of silicon steel, improvement in the heating effect of the new ladle, optimization of deearburization process, electric gear position and amount of slag addition. The electrode consumption of LF furnace reduced from 0.37 kg/t to 0.29 kg/t, and electricity consumption reduced by 5.36 kwh/t per ton steel. As a result, favorable economic benefits were achieved with the direct economic benefit of 19.6693 million yuan.
作者 廖建军 马鹏 官平平 张延和 LIAO Jianjun;MA Peng;GUAN Pingping;ZHANG Yanhe(Xinyu Iron and Steel Group Co.,Ltd.,Xinyu 338001,China)
出处 《有色金属科学与工程》 CAS 2018年第5期49-53,96,共6页 Nonferrous Metals Science and Engineering
关键词 精炼工序 铜包全程加盖 优化RH操作 减少LF通电时间 经济效益 refining processes covering ladle in all processes optimizing RH operation reducing the conduction time of LF economic benefits
  • 相关文献

参考文献16

二级参考文献51

共引文献87

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部