1Huang T, Kong C W, Guo H L, Baldwin A, Li H. A virtual prototyping system for simulating construction processes [J]. Automation in Construction, 2007, 16( 5 ): 576-585.
2Li H, Huang T, Kong C W, Guo H L, Baldwin A, Chan N, Wong J. Integrating design and construction through virttial prototyping[J]. Automation in Construction, 2008, 17 ( 8): 915-922.
3Li H, GUO H L, Skibniewski M J, Skitmore M. Using the IKEA model and Virtual Prototyping technology to improve construction process management[J]. Construction Management and Economics, 2008, 26 ( 9 ): 991-1000.
4Li H, Guo H L, Skitmore M, Huang T, Chan N, Chan G. Rethinking prefabricated construction management using the VP-based IKEA model in Hong Kong[J]. Construction Management and Economics, 2011, 29 ( 3 ): 233-245.
5Guo H L, Li H, Skitmore M. Life cycle management of construction projects based on Virtual Prototyping technology[J]. Journal of Management in Engineering, ASCE, 2010, 26 (1): 41 47.
6Guo H L, Li H, Chan G, Skitmore M. Using game technologies to improve the safety of construction plant operations[J]. Accident Analysis and Prevention, 2012, 48: 204-213.
7远方;陶敬华.BIM技术和BLM理念在建筑业信息化发展中的研究[A],2008.
8Chan-Sik Park,Do-Yeop Lee,Oh-Seong Kwon,Xiangyu Wang.A framework for proactive construction defect management using BIM, augmented reality and ontology-based data collection template[J].Automation in Construction.2013
9Changmin Kim,Hyojoo Son,Changwan Kim.Automated construction progress measurement using a 4D building information model and 3D data[J].Automation in Construction.2013
10Kristen Barlish,Kenneth Sullivan.How to measure the benefits of BIM — A case study approach[J].Automation in Construction.2012