摘要
文章结合红水河特大桥主塔施工实例,针对红水河特大桥折H型变截面的特殊工艺设计,分析了主塔液压爬模施工过程中的重大风险,并从安全防护技术及安全管理两个层次,探讨了施工过程中应采取的安全措施,为类似工程施工过程中的安全管理工作提供指导。
Combining the construction example of the main tower of Hongshui River Bridge,and regarding the special process design of H-shaped variable cross-section of Hongshui River Bridge,this article analyzed the major risks during the hydraulic creeping formwork construction of main tower,then ,from two levels of safety protection technology and safety management, it discussed the measures to be taken during the construction, thus providing the guidance for the safety management work during the construction of similar projects.
作者
植运华
ZHI Yun-hua(Guangxi Road and Bridge Engineering Group Co.,Ltd.,Nanning,Guangxi,530011)
出处
《西部交通科技》
2018年第7期120-123,共4页
Western China Communications Science & Technology
关键词
主塔
爬模
安全
管理
Main tower
Creeping formwork
Safety
Management