摘要
本文结合公路施工项目三级配电设备选型及采购现状,对项目临时用电工作中三级配电设备选型的重要性和意义进行了阐述,规范了三级配电设备选型工作流程,形成了一套标准,适用的工作方法,有力的保障了项目临时用电工作顺利推进和实施,具有实践指导意义。
Combining with the present situation of type selection and purchasing of three -level distribution equipment in highway construction project,this paper expounds the importance and significance of type selection of three- level distribution equipment in temporary power consumption of the project,standardizes the working process of type selection of three-level distribution equipment,forms a set guarantees the imminence of the project. It is of practical standards and applicable working methods,and effectively significance to promote and implement electricity utilization smoothly.
作者
张海强
ZHANG Hai-qiang(Gansu Wan Tai Construction Engineering Co.,Ltd.,Lanzhou Gansu 730000,China)
出处
《科技视界》
2018年第23期232-233,共2页
Science & Technology Vision
关键词
公路施工项目
三级配电
选型方法
Highway construction project
Three stage power distribution
Selection method