期刊文献+

杭黄客专黄山北枢纽列车跨线运行方案探讨 被引量:1

Scheme of Cross lines Operation in Huangshanbei Station of HangzhouHuangshan Dedicated Passenger Line
下载PDF
导出
摘要 对RBC切换原则进行说明,结合杭黄客专黄山北枢纽实际站场对RBC切换方案进行分析,针对实际线路不满足RBC通信切换的条件,提出通过CTCS-3转CTCS-2和联锁代传信号授权延伸RBC数据覆盖范围,以解决场间列车跨线运行的问题。 This paper describes the principle of RBC handover and analyzes the RBC handover scheme based on the real yard situation of Huangshanbei station of Hang-Huang dedicated passenger line(DPL). For the problem that an operational line cannot satisfy the communication condition of RBC handover, it puts forward a solution to add level transition from CTCS level 3 to level 2 and extend the RBC controlling data scope through sending SA by interlocking.
作者 纪明慧 Ji Minghui(Beijing National Railway Research & Design Institute of Signal & Communication Group Co.,Ltd.,Beijing 100070,China;Beijing Engineering Technology Research Center of Operation Control Systems for High Speed Railways,Beijing 100070,China)
出处 《铁路通信信号工程技术》 2018年第9期6-9,共4页 Railway Signalling & Communication Engineering
关键词 列车运行控制 无线闭塞中心 切换方案 CTCS RBC handover scheme
  • 相关文献

参考文献2

二级参考文献1

共引文献1

同被引文献6

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部