期刊文献+

数值模拟在济宁铁矿矿坑涌水量预测中的应用 被引量:1

Application of Numerical Simulation in Predicting Mine Water Inflow in Jining Iron Deposit
下载PDF
导出
摘要 山东省济宁铁矿埋藏在济宁群变质岩中,铁矿石资源量约18.34亿t,因埋深在1 000m以下,开采条件较差,为查明水文地质条件,施工了1 500m深的水文地质勘探孔,在此基础上进行了抽水试验,取得了水文地质参数。通过数值模拟预测了-1 200 m,-1 300 m,-1 400 m,-1 500 m开采水平的正常矿坑涌水量分别为998.56 m^3/d,1 079.27m^3/d,1 159.98m^3/d,1 240.68m^3/d,为开采可行性研究提供了水文地质数据。 Jining iron deposit in Shandong province is buried in metamorphic rocks of Jining group. The iron ore resources are about 1.834 billion tons. Because the buried depth is below 1000m, and the mining condition is bad, in order to identify hydrogeological condition, hydrogeological exploration drilling holes with the depth of 1500m have been constructed. On these basis, pumping test has been carried out, and hydrogeological parameters have been gained. Through numerical simulation, it is predicated that normal mine water inflows at the depth of 1200m, 1300m, 1400m, 1500m are 998.56m3/d, 1079.P7m3/d, 1159.98m3/d, 1240.68m3/d respectively. It will provide hydrogeological data for feasibility study of mining.
作者 王仕昌 邱恺毅 WANG Shichang;QIU Kaiyi(Shandong Geophysical and Geochemical Exploration Institute,Shandong Jinan 250013,China)
出处 《山东国土资源》 2018年第10期120-124,共5页 Shandong Land and Resources
关键词 数值模拟 矿坑涌水量 济宁铁矿 Numerical simulation mine water inflow Jining iron deposit
  • 相关文献

参考文献16

二级参考文献117

共引文献230

同被引文献20

引证文献1

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部