摘要
溧阳抽水蓄能电站上水库两座交通桥为连续刚构梁,其连接进出水塔和库岸及(1)号副坝的环库路,针对其施工难点,探索出了一套适合薄壁双肢高墩的连续刚构桥梁施工技术,取得了良好的效果。
The two traffic bridges in the upper reservoir of Liyang Pumped-storage Power Station are continuous rigid frame beams, which connect two intake towers to reservoir bank and circular reservoir road of No. 1 auxiliary dam. Based on the analyses on construction difficulties, a set of continuous rigid frame bridge construction technology suitable for thin-walled double-limb high pier is explored, which has obtained good achievements.
作者
史永方
邢磊
SHI Yongfang;XING Lei(Jiangsu Guoxin Liyang Pumped Storage Power Generating Co.,Ltd.,Liyang 213334,Jiangsu,China)
出处
《水力发电》
北大核心
2018年第10期33-35,77,共4页
Water Power
关键词
交通桥
连续刚构梁
溧阳抽水蓄能电站
traffic bridge
eontinttous rigid frame beam
Liyang Pumed-storage Power Station