摘要
在西北地区的工程施工中,湿陷性黄土是比较常见的地质问题之一,其对工程质量、施工进度等有着很大影响。论文分析了湿陷性黄土的形成原因,不但能对该地区的地质状况加以了解,制定出合理有效的处理措施,而且有利于施工管理工作的顺利开展,确保施工质量,提高施工进度。
In the engineering construction in the Northwest region, collapsible loess is one of the more common geological problems,which has a great influence on the quality of the project and the construction progress. This paper analyzes the forming causes of thecollapsible loess, it can not only understand the geological conditions of the area, but also make reasonable and effective treatment measure s. It is also conducive to the smooth development o fthe construction management work, to ensure the construction quality and improve the construction progress.
作者
袁文金
YUAN Wen-jin(Gansu Provincial Traffic Planning Investigation and Design Institute Co.Ltd.,Lanzhou 730000,China)
出处
《工程建设与设计》
2018年第19期82-83,87,共3页
Construction & Design for Engineering
关键词
湿陷性黄土
形成原因
处理措施
collapsible loess
cause of formation
treatment measures