摘要 地铁暗挖区间施工过程中常遇到既有给、排水管线,土体开挖是应力释放的过程,开挖前需采取有效的超前加固措施,避免既有管线结构发生受拉破坏,如产生渗水或涌水等情况,则会危及暗挖区间及周边构筑物的安全。基于沈阳地铁10号线淮河街站~百鸟公园站暗挖区间的管线渗漏水现象,从动态设计及处理措施选择等方面对该风险点进行了研究,可为类似地层的相似工程问题设计或处理提供参考。 During the construction of buried excavation o fmetro tunnels, existing drainage pipelines often located adjacent to the tunnels. Soil excavation is a process of stress release. Thus, effective pre-support measurements need to be installed before excavation to avoid tension failure in existing pipeline, which can cause water seepage or surge. The safety of metro tunnel and existing buildings will be influenced. In this paper, based on the pipeline leakage of metro tunnel from Huaihe Station to Bainiao park Station of Shenyang metro line 10, the dynamic design and treatment measurements for risk points were studied. The results can provide good guidance for the similar engineering problems in design and construction.
作者 邵葳 SHAO Wei(Beijing Urban Construetion Design&Development Group Co.Ltd.,Shenyang Branch,Shenyang 110086,China)
出处 《工程建设与设计》 2018年第19期98-100,共3页 Construction & Design for Engineering
关键词 富水砂层 暗挖区间 管线渗水 动态设计 rich water sand layer buried excavation tunnel pipeline leakage dynamic design
  • 相关文献

参考文献4

二级参考文献40

共引文献136

同被引文献15

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部