8FIDIC. Conditions of Contract for Construction, for Building and Engineer- ing Works Designed by the Employer, First Edition 1999 [M]. Geneva, Switzer- land: FIDIC, 1999.
9FIDIC. Conditions of Contract for Construction, for Building and Engineer- ing Works Designed by the Employer, 4th edition, 1987 Revised 1992 [M]. Geneva, Switzerland: FIDIC,1999.
10Yeo K T, Ning J H. Integrating supply chain and critical chain concepts in engineer-procure-construct (EPC) projects[J]. International Journal of Project Management, 2002, 20 (4): 253-262.