某燃煤电厂NDC试验简介

Brief Introduction of NDC Test for a Coal-fired Power Plant
原文传递
导出
摘要 针对某2×150 MW燃煤机组进行NDC(Net Dependable Capacity,机组或电厂的净可靠能力)试验研究。在MCR工况下,调整机组参数,降低厂用电率,通过在线监测和手工实测相结合的方式,连续96 h,测试机组净出力能否达到合同值。试验结果表明,基于合同规定的试验条件下,机组净可靠容量满足合同要求。 The experimental research of NDC(Net Dependable Capacity, the net dependable capacity for the unit or the plant) for 2×150 MW coal-fired power plant was done. On MCR condition, the test performed for consecutive 96 hours by the way of combining online monitoring and manual measurement, to verify whether the net power output attains the values specified in the contract, under adjustment range of unit parameters and effectively reducing power consumption rate. The test results showed that the net dependable capacity of units meet the contract requirements.
作者 王一晴 WAMG Yi-qing
出处 《电站系统工程》 2018年第5期73-74,共2页 Power System Engineering
关键词 净出力 可靠性 机组主要运行参数 电能表 net dependable capacity reliability main operating parameters megawatt-hour meter
  • 相关文献

参考文献3

二级参考文献10

共引文献125

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部