期刊文献+

基于BIM模型交互的风场模拟分析研究

Wind-Field-Simulation Analysis Based on BIM Technique
下载PDF
导出
摘要 结合BIM与CFD风场模拟技术,建立基于BIM平台的Revit建筑模型,并通过模型交互衔接,导入Phoenics风场模拟环境,计算出各个风况的风场环境信息,以此评价室外风场的状况与Revit→Phoenics模型交互应用的可行性。研究结果表明:基于BIM模型交互应用的方法进行建筑场地通风模拟,能取得较好的效果,且通过模型的交互衔接可有效地在项目规划阶段利用BIM技术为设计师进行辅助参考及优化设计。 Combined with B/M and CFD wind field simulation technology, the paper established Revit architecture model based on BIM platform. Wind field information in various wind conditions were calculated by making the transformation from Revit to Phoenics, which was used to estimate the wind conditions and practicability of interactive application of Revit and Phoenics. The research results showed that it made effect in the BIM software interactive application to simulate site ventilation, which assisted the designers in optimizing the design in project planning stage.
作者 李业骏 展晓东 陈辰 LI Ye-jun;ZHAN Xiao-dong;CHEN Chert(Jiangsu Zhongsen Architectural Design Co.,Ltd.,Zhenjiang 212009,Jiangsu,China)
出处 《建筑节能》 CAS 2018年第10期80-83,共4页 BUILDING ENERGY EFFICIENCY
关键词 Phoenics CFD 风场模拟技术 模型交互 Phoenics CFD wind - field - simulation technology model interaction
  • 相关文献

参考文献7

二级参考文献55

  • 1杨科,康登泽,车传波,徐鹏.基于BIM的碰撞检查在协同设计中的研究[J].土木建筑工程信息技术,2013,5(4):71-75. 被引量:56
  • 2张德海,韩进宇,赵海南,姚云峰,尹莉.BIM环境下如何实现高效的建筑协同设计[J].土木建筑工程信息技术,2013,5(6):43-47. 被引量:39
  • 3Kerzner H. Project management: a system approach to planning, scheduling, and controiling [ M ]. New Jersey : John Wiley & Sons, 2006:2-7.
  • 4The American Institute of Architects. Intergrated project delivery: a guide [ M ]. USA: The American Institute of Architects, 2007.
  • 5Moore C, Mosley D, Slagle M. Partnering guidelines for win-win project management [ J ]. Project Management Journal, 1992,22 ( 1 ) : 18-21.
  • 6友恪劳.希尔建筑信息公司.建筑信息模型-设计与施工的革新,生产与效率的提升[R].美国:麦格劳-希尔建筑信息公司,2010.
  • 7Harvey R, Bahgat T. Gerbe D, et al. BIM as a risk management platform enabling integrated practice and delivery [ M 1. Manitoba. Canada: Matrix Group Publishing, 2009.
  • 8Nour M. Performance of different (BIM/IFC) exchange formats within private collaborative workspace for collaborative work [ J ]. Journal of Information Technology in Construction, Special Issue Building Information Modeling Applications, Challenges and Future Directions, 2009,14:736- 752.
  • 9Flager F, Welle B, Bansal P, et al. Multidisciplinary process integration and design optimization of a classroom building [ J ]. Journal of Information Technology in Construction, 2009,14:595-612.
  • 10Aalst W M P, Hee K M. Workflow management: models, methods, and systems [ M ]. Cambridge, MA: MIT Press, 2002.

共引文献205

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部