摘要
地下综合管廊能够解决现阶段的地下网管管理混乱、布局不合理等问题,施工一般采用明挖法。但是,对于地下空间开发难度较大的工程,明挖法不再满足工程的要求。将逆作法应用于综合管廊的施工能解决实际工程问题,合理的施工方法能保证工程的安全。
The underground pipe gallery can solve the problems of disordered management and unreasonable layout of underground pipe network at the current stage, which often is constructed by cut and cover method. For projects with difficult development of underground space, cut and cover method no longer meets the requirements of the project. Applying the up-down method to the construction of the underground pipe gallery can solve practical engineering problems and reasonable construction methods can ensure the safety of the project.
作者
黄子灿
卢海林
翟金明
HUANG Zi-can;LU Hai-lin;ZHAI Jin-ming(Wuhan Institute of Technology,Wuhan 430074,China)
出处
《价值工程》
2018年第31期98-99,共2页
Value Engineering
关键词
地下综合管廊
逆作法
施工工序
underground pipe gallery
up-down method
construction methods