期刊文献+

试论钢结构厂房施工与安装质量控制要点 被引量:2

The construction and installation quality control of steel structure workshop are discussed
下载PDF
导出
摘要 主要根据我国目前的情况,分析了国内钢结构厂房主要的钢结构节点连接形式,针对其高强度螺栓连接、全焊型连接、摩擦型高强度螺栓与焊缝形成的混合连接等几种形式,提出目前钢结构施工与安装的问题,并针对这些问题给出一系列的有针对性的方案和质量控制要点。 This article mainly according to the current situation in our country now,analysis of the domestic steel structure factory building node connection form,the main steel structure for its high strength bolt connection type,the whole welding connection,friction type high strength bolt and weld formation of several forms such as mixed connection,the steel structure construction and installation problems is put forward,and a series of targeted solutions for these problems and key points of quality control.
作者 汤学华 Tang Xuehua(Shanxi Lu'an Engineering Co.,Ltd,Changzhi 046204,China)
出处 《山西建筑》 2018年第27期216-217,共2页 Shanxi Architecture
关键词 钢结构厂房 施工与安装 质量控制要点 steel structure workshop construction and installation key points of quality control
  • 相关文献

参考文献3

二级参考文献13

  • 1YB9257-96.钢结构检测评定及加固技术规程[S].
  • 2JGJ82-2011,钢结构高强度螺栓连接技术规程[S].
  • 3GB50017-2003.钢结构设计规范[S].[S].,..
  • 4CECS77:96.钢结构加固技术规范[S].[S].,..
  • 5JGJ99-98.高层民用建筑钢结构技术规程[S].[S].,.60-65.
  • 6日本钢构造协会接合小委员会.高强度螺栓结合[M].王玉春,陈鸿德,史永吉,等,译.北京:中国铁道出版社,1984.
  • 7罗睿奇,王元清,肖建春,石永久.负载下钢结构梁柱节点加固技术及其工程应用.十三届全国现代结构工程学术研讨会[C],2013:894-901.
  • 8FEMA-267a. Interim Guidelines: Evaluation, Repair, Modification and Design of Welded Steel Moment Frame Structures. USA: Federal Emergency Management Agency, 1995.
  • 9FEMA-267b. Interim Guidelines Advisory No. 2. USA: Federal Emergency Management Agency, 1999.
  • 10FEMA. FEMA-355D. State of the Art Report on Connection Performance. USA: Federal Emergency Management Agency, 2000.

共引文献19

同被引文献12

引证文献2

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部