摘要
分析了超高层建筑计划管理和现场施工组织方面的特点,探讨了计划协调管理方面的相应对策,阐述计划协调管理的体系建设和管理职能定位,并从BIM应用、计划跟踪考核、计划与垂直运输等资源的协调、作业面移交等方面介绍了实际应用经验。
This paper analyzes the characteristics of plan management and field construction organization for super tall building engineering,discusses corresponding countermeasures of plan coordination management,introduces system construction and management function orientation,practical application experience of building information modeling,plan tracking assessment,coordination of plan and vertical transportation,and operation surface transfer.
作者
黄绍宁
黄琳
黎汉杰
唐际宇
王东
HUANG Shaoning;HUANG Lin;LI Hanjie;TANG Jiyu;WANG Dong(Guangxi Branch of China Construction Eighth Engineering Division Co.,Ltd.,Nanning,Guangxi 530028,China;Shanghai Sankai Construction Management Consulting Co.,Ltd.,Shanghai 200070,China)
出处
《施工技术》
CAS
2018年第18期14-16,20,共4页
Construction Technology
关键词
高层建筑
计划协调
总承包
管理
应用
tall buildings
plan coordination
general contract
management
application