期刊文献+

南宁华润中心东写字楼项目计划协调管理在总承包管理中的应用 被引量:5

Application of Plan Coordination Management in General Contract Management for East Office Building Engineering of Nanning Huarun Center
下载PDF
导出
摘要 分析了超高层建筑计划管理和现场施工组织方面的特点,探讨了计划协调管理方面的相应对策,阐述计划协调管理的体系建设和管理职能定位,并从BIM应用、计划跟踪考核、计划与垂直运输等资源的协调、作业面移交等方面介绍了实际应用经验。 This paper analyzes the characteristics of plan management and field construction organization for super tall building engineering,discusses corresponding countermeasures of plan coordination management,introduces system construction and management function orientation,practical application experience of building information modeling,plan tracking assessment,coordination of plan and vertical transportation,and operation surface transfer.
作者 黄绍宁 黄琳 黎汉杰 唐际宇 王东 HUANG Shaoning;HUANG Lin;LI Hanjie;TANG Jiyu;WANG Dong(Guangxi Branch of China Construction Eighth Engineering Division Co.,Ltd.,Nanning,Guangxi 530028,China;Shanghai Sankai Construction Management Consulting Co.,Ltd.,Shanghai 200070,China)
出处 《施工技术》 CAS 2018年第18期14-16,20,共4页 Construction Technology
关键词 高层建筑 计划协调 总承包 管理 应用 tall buildings plan coordination general contract management application
  • 相关文献

参考文献10

二级参考文献35

共引文献77

同被引文献24

引证文献5

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部