摘要
桥梁上部结构的预制梁安装方法较多,如自行式吊机架设法、简易型钢导梁架设法、联合架桥机架设法、双导梁架桥机架设法、跨墩龙门架架设法等,各种方法需根据工程实际情况因地制宜地选择。结合广西百色—靖西高速公路工程巴更大桥,在桥梁一侧设置预制梁场,预制梁采用提升站结合双导梁架桥机架桥的施工技术,有效解决了山岭地区桥梁建设预制梁场布置困难、交通运输不便的施工难题。
There are many precast girder installation methods of bridge superstructure, such as self-propelled crane erection method, simple steel guide girder erection method, joint bridge erection method, double-guide girder erection method, cross pier gantry erection method and so on. All kinds of methods should be selected according to the actual situation of the project based on local conditions. Combined with Bageng Bridge of Baise to Jingxi Highway project in Guangxi, one side of the bridge is provided with precast girder field, and the precast girder adopts the construction technology of lifting station combined with double-guide girder bridge erector, which effectively solves the construction problems of difficult layout and inconvenient transportation of the precast girder field for bridge construction in mountainous areas.
作者
刘宝生
LIU Baosheng(MCC Tiangong Group Co.,Ltd.,Tianjin 300308,China)
出处
《施工技术》
CAS
2018年第18期46-49,共4页
Construction Technology
关键词
桥梁工程
预制梁
提升
施工技术
bridges
precast girders
lifting
construction