摘要 以北京市通州区地下暗涵紧邻新建综合管廊并上穿地铁顶进施工为工程背景,分析暗涵顶进过程因卸载地铁上方土体压力和暗涵受单侧偏压状态下对地铁结构、综合管廊和暗涵线位的影响,通过采取袖阀管注浆、衡重顶进、侧向超挖、顶进姿态提前调控和调整取土方式等控制措施,保证了地铁线路安全运营,保护了管廊结构,并顺利完成暗涵顶进施工。 Based on the jacking construction activities of a buried concealed culvert that is close to utility tunnel and crossing above subway structures, this paper analyzes the influence of the jacking process on the subway structure and the utility tunnel, and introduces the key process of the weighing jacking, the over-excavation, the embedded guide and the sleeve valve tube grouting.
作者 段继锋 DUAN Jifeng(Belting Investment Group Co.,Ltd.,Belting 100029,China)
出处 《施工技术》 CAS 2018年第18期76-80,共5页 Construction Technology
关键词 地下工程 暗涵 管廊 衡重顶进 施工技术 underground buildings buried culvert utility tunnel weighing jacking construction
  • 相关文献

参考文献6

二级参考文献38

共引文献63

同被引文献15

引证文献4

二级引证文献13

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部