摘要
分布式电源接入配电网的接入点选择和定容对于配电网的维护和运行有着很大的影响。本文以DG的建设和维护成本、网络损耗成本、节约的购电成本以及电压偏差四个方面作为目标,采用帝国竞争算法(ICA),对配电网33节点接入DG的位置和容量进行研究,得到最优解,对配电网的规划和运行具有重大意义。
The access point selection and constant capacity of distributed power access to the distribution network have a great influence on the maintenance and operation of the distribution network. Taking the DG's construction and mainte nance costs, network loss costs, cost saving power purchase costs, and voltage deviation as targets, the Empire Competi tive Algorithm (ICA) was used to study the location and capacity of the 33 node access DG to the distribution network. Obtaining the optimal solution was of great significance to the planning and operation of the distribution network.
作者
许健伟
安允展
XU Jianwei;AN Yunzhan(Nanjing Institute of Technology,Nanjing 211167,China)
出处
《电工技术》
2018年第20期81-83,共3页
Electric Engineering
关键词
分布式电源
选址和定容
帝国竞争算法
配电网
distributed power supply
site selection and constant capacity
imperial competition algorithm
distribution network