摘要
根据马圈沟水库工程坝址区地形、地质条件,结合建筑物的布置,从建筑材料、工程施工、工程投资以及对环境的影响等方面对拟定的上、下坝址方案进行比较,结果:在同等条件下,上坝址方案技术经济指标较优,推荐采用。
For Maquangou Reservoir project, upper dam site and lower dam site were compared in respects construction materials, construction, cost and environmental influence according to the topographical and geological conditions, combined with layout of structures. The upper dam site was recommended with better technical and economic indexes.
作者
胡浩
HU Hao(Xinjiang Water Conservancy and Hydropower Survey and Design Institute,Urumqi 830000,China)
出处
《广西水利水电》
2018年第5期30-32,共3页
Guangxi Water Resources & Hydropower Engineering
关键词
马圈沟水库
坝址
经济指标
效益
Maquangou Reservoir
dam site
economic index
benefit