灯泡贯流机组大修后启动试验简述

Start-up test process of turbine generator unit after overhaul
下载PDF
导出
摘要 介绍了长洲水电厂的基本情况和灯泡贯流式机组大修后启动试验的相关要求。对试机前的各项检查和机组流产充水试验、发电机组静态试验、动态试验、机组同期并网及甩负荷试验的整个过程作了详细说明。通过检修后对灯泡贯流式机组全面检查、试验,确保机组能长期安全稳定运行。 An introduction was made on the quirements for start-up test of bulb turbine general information of Changzhou Hydropower Station, the relevant regenerator unit after overhaul, the inspection before star-up, water filling test of flow passage, static and dynamic tests of unit, unit synchronization and load rejection test. Overall inspection and test after maintenance of bulb turbine generator unit permit long-term safe and stable operation.
作者 杨占鳌 YANG Zhan-ao(SPIC Guangxi Changzhou Hydropower Development Co.,Ltd.,Wuzhou 543002,China)
出处 《广西水利水电》 2018年第5期74-76,84,共4页 Guangxi Water Resources & Hydropower Engineering
关键词 灯泡贯流式 大修 试验 长洲水电厂 Bulb turbine overhaul test Changzhou Hydropower Station