摘要 针对城市地铁辅助通道进隧道正线施工,辅助通道位置开洞部位较多,围岩扰动次数多,土体受力转换复杂,结构受力薄弱的特点,在系统分析了隧道周围岩土体变形机理基础上,提出了一种全新的辅助通道门式钢架扩挖进隧道正线施工方法。通过对三种不同辅助通道进隧道正线施工方案对比,对其施工进度、风险、成本、沉降控制及支护体系转换等进行了多方面分析,以选择合理的施工方案,对类似工程施工具有一定的指导意义。 In view of the construction of the main entrance of the auxiliary tunnel of urban subway, there are many holes in the auxiliary passage way, the disturbance of surrounding rock is frequent, the transform of stress of the soil is complex, and the structural stress is weak. On the basis of systematic analysis of the deformation mechanism of tunnel surrounding rock and soil mass, a brand new auxiliary channel portal steel expansion and excavation method is put forward. The construction schedule, risk, cost, settlement control and support system conversion are analyzed through the comparison of three different horizontal tunnel construction schemes. The selection of reasonable construction scheme is of certain guiding significance for similar engineering construction.
作者 张朋 陈立鹏 陈万丽 黄海滨 高真儒 Zhang Peng;Chen lipeng;Chen Wanli;Huang Haibin;Gao Zhenru(Qingdao Municipal Engineering Design and Research Institute Co.,Ltd.,Qingdao266061,Shandong)
出处 《工程建设》 2018年第9期62-66,共5页 Engineering Construction
关键词 地铁 辅助通道 隧道正线 支护体系 Metro auxiliary passage tunnel main line support system
  • 相关文献

参考文献6

二级参考文献19

共引文献38

同被引文献4

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部