摘要
提出了马脊梁矿千万吨流程再造配套供电系统的优化配置实施方案,详细介绍了该方案的优化思路、整体框架、应用效果和技术指标。
This paper proposes an optimal configuration implementation plan for the 10 million tons process re- engineered supporting power supply system of Majiliang Mine, and introduces the optimization ideas, overall framework, application effects and technical indicators of the solution in detail.
作者
李录涛
刘轶
Li Lutao;Liu Yi
出处
《同煤科技》
2018年第5期41-43,共3页
Datong Coal Science & Technology
关键词
流程再造
供电系统
优化配置
Process reengineering
Power supply system
Optimal configuration
Application