摘要
笔者分析长洲水利枢纽泄水闸门设计、施工、运行等情况,结合长洲水利枢纽泄水闸部分工作闸门门槽凹陷以及混凝土淘空、闸门局部漏水等问题,分析异常发生的原因并阐述闸门缺陷处理过程,在采取相关措施后确保了闸门安全稳定运行。
The author analyzes the design, construction and operation of the sluice gate of Changzhou Hydro Project, Combining with the problems of gate groove concave, concrete delve and local leakage of the sluice gate of Changzhou Hydro Project, shares the causes of abnormal occurrence and expounds the treatment process of the gate to ensure the safe and stable operation of the gate.
作者
杨占鳌
YANG Zhan'ao(SPIC Guangxi Changzhou Hydropower Development Co.,Ltd.,Wuzhou,Guangxi,54300)
出处
《红水河》
2018年第5期87-89,共3页
Hongshui River
关键词
长洲水利枢纽
泄水闸
工作闸门
缺陷
处理
Changzhou Hydro Project
sluice
operating gate
defect
treatment