浅埋傍山隧道开挖方式对边坡扰动数值分析 被引量:1

Numerical analysis of slope disturbance by excavation method of shallow buried hill tunnel
下载PDF
导出
摘要 通过分析大断面隧道开挖常用的台阶法、CD法、CRD法和双侧壁导坑法的特点,提出如何选用合理的开挖方式以减小对边坡的扰动。结果表明:浅埋傍山隧道与普通隧道变形存在较大差异,坡顶下沉显著增大,水平收敛较小,变形监测应以坡顶下沉为主。据此,为傍山隧道设计和施工方法的选择提供理论依据。 This paper analyzes the characteristics of step method, CD method, CRD method and double sidewall guide pit method commonly used in large section tunnel excavation. How-to choose reasonable excavation method to reduce the disturbance of slope is proposed. The results show that the deformation of shallow- buried mountainside tunnel is different from that of normal tunnel tunnel, and the slope top subsidence is signifi- cantly increased with less horizontal convergence. Therefore, it provides a theoretical basis for the design and construction methods of the tunnel.
作者 方攀 Fang Pan(School of Highway Engineering,Chang'an University,Xi'an 710064,China)
出处 《山西建筑》 2018年第28期136-137,共2页 Shanxi Architecture
基金 中铁七局集团公司科技项目(17A13)
关键词 隧道工程 浅埋傍山隧道 数值分析 开挖方案 边坡稳定性 tunnel engineering shallow- buried hill tunnel numerical analysis excavation scheme slope stability
  • 相关文献

参考文献5

二级参考文献44

共引文献214

同被引文献8

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部