期刊文献+

盾构机硬岩掘进管片上浮问题分析及改进措施 被引量:10

Analysis and Improvement Measures of Shield Machine Hard Rock Segment Floating Problem
下载PDF
导出
摘要 为了解决在全断面硬岩地层盾构施工中管片上浮及错台问题,结合工程实际情况,从地下水和注浆浆液、约束条件、盾构掘进姿态、人为因素等4个方面分析管片上浮及错台的成因,并提出豆砾石回填灌浆、止浆板与隔水环、定位销、优化传力衬垫等控制措施。 In order to solve the problem of floating and dislocation segment in the whole section of hard rock shield machine, combined with the engineering practice, this paper analyzes the causes and dislocation segments floating from the ground and grouting, constraints, attitude, shield and human factors, and puts forward the control measures of gravel backfilling grouting, grouting plate water septum ring, positioning pin, load cushion optimization.
作者 史华 SHI Hua(Shangqiu Polytechnic,Shangqiu,He'nan 476100,China)
出处 《施工技术》 CAS 2018年第19期38-41,45,共5页 Construction Technology
关键词 盾构 硬岩地层 管片上浮 错台 改进措施 shields hard rock segment floating dislocation improvement measures
  • 相关文献

参考文献6

二级参考文献36

共引文献96

同被引文献95

引证文献10

二级引证文献30

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部