期刊文献+

超高层外挂塔式起重机支撑体系优化与安装施工技术 被引量:3

OPTIMIZATION AND INSTALLATION TECHNOLOGY OF SUPPORT SYSTEM FOR SUPER HIGH-RISE TOWER CRANE
下载PDF
导出
摘要 结合昆明西山万达广场项目情况,介绍了外挂式动臂塔式起重机支撑体系受工程结构特点的影响,塔式起重机标准C型梁无法直接安装与使用的情况下,对外挂动臂塔式起重机"C型梁+叠合梁"的常规支撑体系进行了优化与改进,减小支撑体系的复杂程度,降低施工难度,同时采取了一系列保质、降危、增效的施工方法,提高施工效率和安装精度,保证施工质量。 Based on the situation of Kunming Xishan Wanda Plaza project, introduces the influence of plug-in jib tower crane support system by structural characteristics, the situation of tower crane standard C type beam cannot be directly installed and used, the conventional dynamic plug-in support system "C beam + overlapped beam" for optimization and improvement. Reduce the complexity of support system, reduce the difficulty of construction, and taken a series of quality, reduced risk, and improve the efficiency of the construction method, the installation accuracy of construction efficiency, ensure the quality of construction.
作者 石立国 李增玉 张茅 翁邦正 张田庆 SHI Li-guo;LI Zeng-yu;ZHANG Mao;WENG Bang-zheng;ZHANG Tian-qing(China Construction Second Engineering Bureau Ltd.,100160,Beijing,China)
出处 《建筑技术》 2018年第10期1075-1078,共4页 Architecture Technology
基金 中建股份科技研发课题(CSCEC-2015-Z-28)
关键词 超高层建筑 外挂塔式起重机 支撑体系 C型梁+叠合梁 super high rise building hanging tower crane support system C beam + overlapped beam
  • 相关文献

参考文献3

二级参考文献9

共引文献24

同被引文献11

引证文献3

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部