摘要 首先论述了连续预应力混凝土T梁桥发展现状,明确了预制的装配式T梁桥优势,其后具体探讨了连续预应力混凝土T梁预制与安装施工工艺流程与质量控制要点,最后就国藩路大桥工程展开实例分析,以期类似工程项目的实施提供参考。 In recent years, continuous prestressed concrete T beam has been widely applied in our country, the sectional resistance moment is large, light weight, convenient construction, to do a good job of T beam prefabrication and installation of bridge the smooth realization of the goal overall quality, progress and so on all play a decisive role. This article first discusses the development status of continuous prestressed concrete T beam bridge, the advantage, prefabricated prefabricated T girder bridge followed by specific probes into the continuous prestressed concrete T beam construction technology for prefabrication and installation process and quality control point, finally the SAN road bridge engineering example analysis, in order to provide reference for similar engineering project implementation.
作者 黄锋 HUANG Feng(Hunan Construction Transportation Construction Co.,LTD.,Changsha,Hunan 410004,China)
出处 《黑龙江交通科技》 2018年第10期93-94,共2页 Communications Science and Technology Heilongjiang
关键词 连续预应力混凝土T梁 预制 安装 工艺流程 工程案例 continuous prestressed concrete T beam prefabricated Installation process flow the engineering case
  • 相关文献

参考文献3

二级参考文献7

  • 1吴建强,彭武,何治学.KLD3700型跨缆吊机在润扬大桥悬索桥钢箱梁吊装施工中的应用[J].筑路机械与施工机械化,2005,22(7):44-46. 被引量:15
  • 2JT/T4—2004,公路桥梁板式橡胶支座[S]
  • 3阿尔及利亚东西高速公路专用技术条款(CCTP)[Z],2006.
  • 4颜东煌,张劲超,涂光亚,等.鄂黄长江大桥静载作用下支座摩擦系数的识别及影响[C].中国公路学会桥梁和结构工程学会2003年全国桥梁学术会议论文集,2003.
  • 5郑绍珪,袁伦一,鲍卫刚.公路钢筋混凝土及预应力钢筋混凝土桥涵设计规范.JTG D61-2004.北京:人民交通出版社,2004.
  • 6路桥集团第一公路工程局.公路桥涵施工技术规范(JTJ041-2000).北京:人民交通出版社发行,2001.
  • 7周永兴,何兆益,邹毅松.路桥施工计算手册.北京:人民交通出版社,2001.5.

共引文献3

同被引文献8

引证文献4

二级引证文献22

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部