摘要
本工程前期按常规集装箱堆场设计,不同陆域形成区域采用相应的软基地基处理方案并已完成部分施工。后期针对自动化集装箱堆场升级要求并结合前期地基处理效果,提出多种地基补强处理方案,力求达到进一步消除地基残留沉降,满足自动化集装箱堆场使用要求的目的。
A conventional container yard was designed in early stage of the project, different soft foundation treatment plans applied to the corresponding areas and part of construction was completed. In view of the upgrading requirements for automated container yard in later stage of the project, the effect of early-stage foundation treatment was studied and a variety of foundation reinforcing plans were proposed in order to further eliminate the residual settlement and meet the use requirements.
作者
范莹莹
远航
陈思周
Fan Yingying;Yuan Hang;Chen Sizhou(CCCC First Harbor Consultants Co.,Ltd.,Tianjin 300222,China;Construction Branch of Qingdao Port International Co.,Ltd.,Qingdao Shandong 266000,China)
出处
《港工技术》
2018年第5期104-107,共4页
Port Engineering Technology
关键词
陆域形成
地基处理
补强
自动化
集装箱堆场
码头
港口工程
land formation
foundation treatment
reinforce
automation
container yard
wharf
port engineering