摘要
为提高宜兴煤业5809综采工作面的开采效率,对5809综采工作面的布置方式、支护方式、所用设备型号及劳动组织等进行了设计。实践结果表明,该开采方案有助于提高5809综采工作面的开采效率,产生较好的经济效益。
In order to improve the mining effciency of 5809 fully mechanized coal face in Yixing Coal Industry, the layout, support, equipment type and labor organization of 5809 fully mechanized coal face were designed. Practice results show that the mining scheme is helpful to improve the mining effciency of 5809 fully mechanized coal face and produce better economic benefts.
作者
张磊
Zhang Lei(Shanxi Fenxi Yixing Coal Industry,Shanxi Xiaoyi 03230)
出处
《山东煤炭科技》
2018年第10期19-21,共3页
Shandong Coal Science and Technology
关键词
综采
开采
方案
fully mechanized mining
mining
scheme