期刊文献+

龙场渡槽结构方案比选及施工难点探析

Alternative of Longchang Aqueduct Structure Schemes and Study on Difficult Points of Construction
下载PDF
导出
摘要 针对目前水利枢纽输配水工程渡槽结构施工过程存在的问题,文章从实践角度出发,分析了结构方案的比选,并提出了施工总体方案及监控设计控制方法,其目的是确定更具效用的施工方案,进而为相关建设者提供实例参考。 According to the problems existing in the construction course of aqueduct structure in water delivery and distribution engineering of water conservancy pivot,based on the project practice,this paper analyzed alternative of the structure schemes,and put forward the general construction scheme and control method of supervison design,its purpose was to determine the more effective construction scheme,so as to provide references for related constructors.
作者 罗亚松 LUO Ya-song(Guizhou Provincial Water Conservancy & Hydropower Investigation, Design and Research Institute, Guiyang 550002 ,China)
出处 《黑龙江水利科技》 2018年第8期1-3,共3页 Heilongjiang Hydraulic Science and Technology
基金 贵州省重大科技专项计划项目(20126013-3)
关键词 水利枢纽 输配水工程 渡槽方案比选 高大跨拱式渡槽 施工方案 hydraulic pivot water conveyance and distribution project ahernative of aqueductscheme high arch aqueduct construction scheme
  • 相关文献

参考文献1

二级参考文献6

共引文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部