土压平衡盾构隧道管片错台原因及对策 被引量:2

Causes and Countermeasures of Earth Pressure Balance Shield Tunnel Segment Dislocation
下载PDF
导出
摘要 盾构管片错台是成型隧道相邻管片之间接缝处的高差,由错台引起管片破裂、隧道漏水等问题对日后运营的影响日益显现,影响百年地铁工程使用质量。文章结合合肥市轨道交通3号线祁门路站~大剧院站区间右线施工实际情况,分析管片错台原因,对管片错台提出相应的对策。 The wrong platform of the shield segment is the height difference between the joints and the adjacent segments of the forming tunnel. The problems such as the rupture of the tube and the leakage of the tunnel, which are caused by the wrong platform, have an increasingly apparent influence on the future operation, which affects the quality of the use of the subway project for a hundred years. In this paper, according to the actual situation of the construction of the right line of the Qun Road station to the Grand Theatre station of Hefei railway line 3, the reasons for the wrong platform are analyzed and the corresponding countermeasures are put forward.
作者 何江清 HE Jiang-qing(Jiangsu Jianke Engineering Consulting Co.,Ltd,Nanjing Jiangsu 210000 China)
出处 《江苏建筑》 2018年第5期78-80,共3页 Jiangsu Construction
关键词 盾构管片 错台 原因 防治措施 shield segment wrong platform causes preventive measures
  • 相关文献

同被引文献6

引证文献2

二级引证文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部