期刊文献+

BIM与WBS 被引量:6

BIM&WBS
下载PDF
导出
摘要 建筑工程数据具有其因果关系,智能建造的重点在于建造技术。BIM技术应该植根于建造技术。WBS是项目的综合工具,WBS的每个工作节点就是建造过程的基本方法与工艺,是建造技术的体现,也是智能建造的落脚点,更是BIM系统的基本组件。不同的WBS分解结构就会产生不同的BIM系统。文章分析了基于WBS第四级的open BIM方法及其存在问题,阐明了基于WBS第三级的P-BIM方法,以建造技术为本发展智能(开发分部分项工程软件)建造,为我国BIM落地提出了新的研究方法与发展方向。 Construct Project Data possesses its causal relation, intelligent building's key point is construction technology.BIM Technology takes root in construction technology. WBS is the projects comprehensive tool.Every working section of WBS is the basic method and technology for construction process, embodies construction technology, it is the foothold of intelligent building and the basic element of BIM system. Different WBS work breakdown structure comes from different BIM system.The paper analyses the fourth class open BIM method based on WBS and its problems and explores the third class P-BIM method based on WBS. Taking construction technology as basic principle for promoting intelligent construction(to develop engineering software for subsections and subitems), it puts forward new research method and development trend for implementation of BIM in China.
作者 黄强 HUANG Qiang(China BIM Development Union,Beijing 100013 China)
机构地区 中国BIM发展联盟
出处 《江苏建筑》 2018年第4期1-5,共5页 Jiangsu Construction
关键词 BIM WBS openBIM P-BIM 活动和业务(A&B)OmniClass BIM WBS open BIM P-BIM activity and business(A&B) OmniClass
  • 相关文献

同被引文献25

引证文献6

二级引证文献6

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部