摘要
本文从工程施工的前期、中期及后期三个阶段,探讨高层住宅主体施工阶段的给排水工程监理工作的开展,以期强化监理水平,保障工程质量,满足高层住宅建筑给排水需求。
This paper discusses the development of water supply and drainage engineering supervision in the main construction stage of high-rise residential building from the early, middle and late stages of engineering construction in order to strengthen the supervision level, ensure the quality of the project and meet the water supply and drainage demand of high-rise residential building.
作者
张卡
Zhang Ka(Jiangxi Jianhui Construction Supervision Co.,Ltd.,Xinyu,Jiangxi 338001)
出处
《江西建材》
2018年第12期123-124,共2页
Jiangxi Building Materials
关键词
高层住宅
给排水工程
工程监理
High-rise residential
Water supply and drainage engineering
Project supervision