菏泽电厂二期扩建工程 2座 5 5 0 0m2 钢筋混凝土双曲线冷却塔施工时采用旧钢模 ,为了保证公司提出的创精品目标 ,采用了多种新工艺 ,在未加大成本的前提下 ,提高了工艺质量 ,取得了理想效果。本文重在介绍采取的工艺改进。
Old steel formworks were adopted in the construction of 2 5500m 2hyperbolic reinforcement concrete cooling towers in the second extension project of Heze Power Factory. To achieve the goal of “Construction Refined Building”, engineers used many new techniques to improve construction quality, and got good effect. In this article, authors mainly introduce those techniques and methods.
出处
《施工技术》
CAS
北大核心
2002年第9期32-33,共2页
Construction Technology
关键词
钢筋混凝土
双曲线冷却塔
施工工艺
reinforcement
cooling tower
construction technique