期刊文献+

风电接入的调峰调频电源配置问题研究 被引量:5

下载PDF
导出
摘要 随着风电接入的越来越多,提出了关于风电场等效调峰调频容量的含义,将风电场等效调峰调频容量中,进行风电的接入,充分地将系统调峰在接入风电之后受到的影响进行了体现,对于调峰调频容量配置,则按照pweq来决定。不但依赖于以往的方式来达到电源侧调节机组提高的目的,还着手于风电出力波动视角,通过采取增多储能系统的方法,进而考虑处理风电接入后给系统调峰调频所产生的影响。
作者 刘丰瑞 沈济
机构地区 东北电力大学
出处 《科学技术创新》 2018年第21期50-51,共2页 Scientific and Technological Innovation
  • 相关文献

参考文献2

二级参考文献13

  • 1罗昌荣,张玉琼.高压电气试验中安全的重要性及安全管理对策探讨[J].电工技术(下半月),2015(11):23-23. 被引量:6
  • 2李凤军.关于高压电气设备试验的重要性与相关技术问题的探讨[J].电工文摘,2013(3):1-3. 被引量:19
  • 3CHENG Y, TABRIZI M, SAHNI M, et al. Dynamic available AGC based approach for enhancing utility scale energy storage performanceIJl. IEEE Transactions on Smart Grid, 2014, 5 (2): 1070-1078.
  • 4MASIELLO R D, ROBERTS B, SLOAN T. Business models for deploying and operating energy storage and risk mitigation aspects [ J]. Proceedings of the IEEE, 2014, 102 (7) :1052-1064.
  • 5KINTNER-MEYER M. Regulatory policy and markets for energy storage in north America[ J]. Proceedings of the IEEE, 2014, 102 (7) : 1065-1072.
  • 6WASHINGTON D U F E. Frequency regulation compensation in the organized wholesale power markets [ R ]. Washington DC: Federal Energy Regulatory Commission, 2011.
  • 7PJM. Performance based regulation: year one analysis [ R ]. ValleyForge, PA: 2013.
  • 8KAZEMPOUR S J, HOSSEINPOUR M, MOGHADDAM M P. Self-scheduling of a joint hydro and pumped-storage plants in energy, spinning reserve and regulation markets [ C ]//Power & Energy Society General Meeting, 2009.
  • 9AKHAVAN-HEJAZI H, MOHSENIAN-RAD H. Optimal operation of independent storage systems in energy and reserve markets with high wind penetration [ J 3. IEEE Transactions on Smart Grid, 2014, 5(2):1088-1097.
  • 10MOGHADDAM I G, SAEIDIAN A. Self scheduling program for a VRB energy storage in a competitive electricity market E C 1//2010 International Conference on Power System Technology ( POWERCON), 2010 : 1-6.

共引文献24

同被引文献73

引证文献5

二级引证文献34

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部