摘要
现阶段,随着社会经济发展水平的提升,我国的桥梁工程不断增加,尤其是连续桥梁工程,但由于此类工程的规模较大,在施工过程中常常会出现不能按时完工的状况,甚至使工程出现质量问题,这些问题都会直接影响到桥梁的后续工作,所以为了避免此类状况的发生,在桥梁施工中施工单位一般会利用先简后结的施工技术,此类技术的应用能在保证桥梁质量的前提下,减少工程所用周期,能直接解决延误工期的问题,从而使桥梁工程得以顺利完成,促进桥梁建筑工程的发展。
At present, with the promotion of the social and economic development level, the bridge engineering in our country is increasing, especially the continuous bridge engineering.However, because of the large scale of this kind of project, it often appears in the construction process that it can not be completed on time, even the quality problems of the project, these problems will be straight. In order to avoid the occurrence of the bridge, in order to avoid the occurrence of this kind of situation, the construction units in the bridge construction generally use the construction technology of the first simple and back knot. The application of this kind of technology can reduce the period of the project under the premise of guaranteeing the quality of the bridge, and can directly solve the problem of the delay time, so that the bridge can be solved.The beam project has been successfully completed to promote the development of bridge construction projects.
作者
杨建华
胡士娟
Yang Jian-hua;Hu Shi-juan
出处
《建筑技术开发》
2018年第18期44-45,共2页
Building Technology Development
关键词
先简支后连续
桥梁施工
质量控制
first simply supported after continuous : bridge construction
quality control