渭河杨凌段水景观工程气动盾形闸坝设计 被引量:1

Design of Pneumatic Peltate Gate Dam for Water Landscape at Yangling Section on Wei River
下载PDF
导出
摘要 渭河杨凌段气动盾形闸坝单孔过流宽度90 m,共5孔,为目前中国最长气动盾形闸坝,日前已成功蓄水。渭河是著名的多泥沙河流,通过对杨凌渭河段水沙特性及重点技术问题分析,分析设计重难点技术问题,提出创新性的坝袋分离锚固技术及运行管理方案。阐述了气动盾形闸坝的设计,包括坝址选择、坝高确定、泄流消能设计、渗流设计、基础处理设计等,结合后期运行管理,使之达到经济效益、社会效益、环境效益的最佳组合。 The overflow width at single outlet of pneumatic peltate gate dam at Yangling Section on the Wei River is 90 m. There are five outlets totally. This dam is the longest pneumatic peltate gate one in China currently and impounded currently. The Wei River features dense sediment. Through analysis on water and sediment characteristics at Yangling section and on key technical issues, the key design points and issues are analyzed. The anchoring technology and operating management scheme with innovated dam and bag separation are proposed. The design of pneumatic peltate gate dam is described in terms of dam site selection, dam height determination, flood discharge, energy dissipation, seepage and foundation treatment, etc.. In combination with sequent operating management, the optimizing combination of economic, social and environmental benefits is achieved.
作者 杨珂 吕琦 王凡 张博 高珍 YANG Ke;LYU Qi;WANG Fan;ZHANG Bo;GAO Zhen(Powerchina Northwest Engineering Corporation Limited,Xi'an 710065,China)
出处 《西北水电》 2018年第5期52-55,共4页 Northwest Hydropower
关键词 杨凌 渭河 气动盾形闸坝 最长跨度 水沙特性 泄流能力 消能设计 渗流设计 Yangling Wei River pneumatic peltate gate dam largest span sediment features discharge capacity design of energy dissipation design of seepage flow
  • 相关文献

参考文献10

二级参考文献42

共引文献40

同被引文献14

引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部