摘要
以几内亚苏阿皮蒂水电站为例,对辉绿岩料场爆破开采技术进行了研究。采用小孔径耦合连续装药、大孔距、小排距、微差起爆等技术,提高了炮孔利用率,将爆破大块率降至5%,加快了开采速度,降低了作业成本。
Souapiti Hydropower Project in Guinea is exampled to study technology on exploitation of dolerite quarry by blasting. Measures such as coupling continuously charging with small hole diameter, large hole spacing, small row spacing and millisecond blasting, etc. are applied to improve blasting hole utilization. The large block rate by blasting is decreased to 5%. The exploitation speed is increased and the blasting operation cost is decreased.
作者
李刚
李玉凡
LI Gang;LI Yufan(Sinohydro Bureau 3 Co.,Ltd.,Xi'an 710024,China)
出处
《西北水电》
2018年第5期70-73,共4页
Northwest Hydropower
关键词
辉绿岩
人工骨料
爆破开采
技术研究
dolerite
artificial aggregate
exploitation by blasting