摘要 巴基斯坦SK水电站地下厂房位于整个工程的关键线路,其所处地质条件差,开挖工期紧,厂房顶拱层开挖成功与否关系到整个项目的成败。文章通过对厂房顶拱层施工布置、施工难点、施工程序及施工方法的研究分析,确保了合同履约。相关参数可供类似工程借鉴和参考。 The underground powerhouse of SK Hydropower Station in Pakistan is located in the key line of the whole project.Its geological conditions are poor and the excavation period is short. The success or failure of the excavation of the roof of the powerhouse is related to the success or failure of the whole project. Through the research and analysis of the construction layout, construction difficulties, construction procedures and construction methods of the roof of the powerhouse, the contract performance is ensured. The related parameters can be used for reference in similar projects.
作者 张宏山
出处 《科技创新与应用》 2018年第33期157-159,共3页 Technology Innovation and Application
关键词 地下厂房 顶拱层 开挖 underground powerhouse roof arch floor excavation
  • 相关文献

参考文献1

二级参考文献3

  • 1S.G.Chen,J,G.Cai,J.Zhao,Y.X.Zhou. Discrete element modelling of an underground explosion in a jointed rock mass[J].Geotechnical and Geological Engineering,2010,(02):102-107.
  • 2P.P.Nomikos,P.V.Yiouta-Mitra,A.I.Sofianos. Stability of Asymmetric Roof Wedge Under Non-Symmetric Loading[J].Rock Mechanics and Rock Engineering,2006,(02):23-26.
  • 3林丹,杜锴,谢长水,赵瑞.大岗山水电站地下厂房开挖应力应变控制实践[J].人民长江,2012,43(9):24-27. 被引量:3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部