摘要
对于钢管桩拔桩侧摩阻力的计算有多种计算方法,具有代表性的两种就是APIRP2A的计算方法和国内规范法,为了更好地了解这两种计算方法的特点和差别,通过对不同的工况分别采用API-RP2A的计算方法和国内规范法计算,计算对比分析两者的区别以及产生区别的原因,同时简要分析两种计算方法的优缺点。
There are many calculation methods for the calculation of side friction resistance of steel - pipe pile pulling, and the two representative methods are the calculation method of API - RP 2A and the domestic standard method. In order to better understand the characteristics and diffrences of the two calculation methods, in this paper we calculate the side friction resistance in dirt)rent conditions with two dirt)rent methods, which are API - RP 2A calculation method and domestic standard method. The difference between the two calculation methods and the reasons for the dift)rence are compared and analyzed, at the same time, the advantages and disadvantages of the two methods are briefly analyzed.
作者
徐本春
刘德风
谭斌
朱伟伟
左生荣
喻桥
XU Ben-chun;LIU De-feng;TAN Bin;ZHU Wei-wei;ZUO Sheng-rong;YU Qiao(China First Metallurgical Group Co.,Ltd.Hubei Branch,Wuhan 430080,China;Central Southern China Electric Power Design Institute(CSEPDI)of China Power Engineering Consulting Group Corporation,Wuhan 430071,China;Hubei Provincial Road&Bridge Co.,Ltd.Wuhan 430000,China;School of Transportation,Wuhan University of Technology,Wuhan 430063,China)
出处
《佳木斯大学学报(自然科学版)》
CAS
2018年第5期676-678,717,共4页
Journal of Jiamusi University:Natural Science Edition
关键词
钢管桩
静力拔桩
侧摩阻力
计算分析
steel -pipe pile
pile pulling
side friction
calculation and analysis