基于混合遗传算法的船台装配优化研究 被引量:2

Optimization Research on Assembly Work on Dock Based on a Hybrid Genetic Algorithm
下载PDF
导出
摘要 为了在船台装配作业中最小化船台周期、降低作业成本、均衡资源负荷,分析了船台装配作业的特点并对其进行了建模,设计了一种适于解决本优化问题的混合遗传算法,开发了对应的软件。将最小化船台周期的优化目标体现在解码的过程中,保证了解码的唯一性;同时将降低成本的优化目标体现在评价和选择的过程中。经本方法得出的船台装配日程计划为实际生产提供了很好的指导。最后,通过一个算例,验证了本方法的可行性和有效性。 To minimize the time on building berth, reduce the cost and equipoise the resource load in assembly work on dock, assembly work is analyzed and modeled. And a particular hybrid genetic algorithm is designed. The software is also developed. The process of decoding embodies the goal of minimizing the time on building berth, which guarantees the uniqueness of the decoding. Moreover, the process of evaluation and selection embodies the goal of reducing the cost. The schedule for the assembly work on dock created by this method plays a guiding role in practical production. Finally, an example is given to verify the feasibility and effectiveness of the method.
出处 《船舶工程》 北大核心 2014年第S1期145-148,169,共5页 Ship Engineering
关键词 船台装配 混合遗传算法 资源成本 负荷均衡化 assembly work on dock hybrid genetic algorithm resource cost equipoise the load
  • 相关文献

参考文献4

  • 1姜礼玲,刘金山,柳存根.基于蚁群算法的船台吊装网络优化技术研究[J].船舶工程,2008,30(5):54-57. 被引量:3
  • 2续爱民,金烨.大型散货船船体吊装顺序优化[J].东华大学学报(自然科学版),2006,32(5):1-4. 被引量:5
  • 3J.S. Son,D.M. Lee,I.S. Kim,S.K. Choi.A study on genetic algorithm to select architecture of a optimal neural network in the hot rolling process[J].Journal of Materials Processing Tech.2004
  • 4Jae Kyu Lee,Kyoung Jun Lee,Hung Kook Park,June Seok Hong,Jung Seung Lee.Developing scheduling systems for Daewoo Shipbuilding: DAS project[J].European Journal of Operational Research.1997(2)

二级参考文献12

  • 1颜蔚,葛世伦,吴立人.基于Project2002的多项目船台计划管理研究[J].造船技术,2005,33(5):4-8. 被引量:2
  • 2甘屹,齐从谦,杜继涛.基于蚁群算法的动态联盟伙伴选择研究[J].系统仿真学报,2006,18(2):517-520. 被引量:21
  • 3续爱民,金烨.基于改进免疫遗传算法的船台吊装网络优化[J].计算机集成制造系统,2006,12(5):715-720. 被引量:5
  • 4续爱民,金烨.大型散货船船体吊装顺序优化[J].东华大学学报(自然科学版),2006,32(5):1-4. 被引量:5
  • 5Mclean C,Shao G.Simulation of shipbuilding operations.In:Proceedings of the 2001 Winter Simulation Conference.United States:Institute of Electrical and Electronics Engineers Inc,2001:870-876
  • 6Lee J K,Lee K J,Park H K,et al.Developing Scheduling Systems for Daewoo Shipbuilding:DAS Project.European Journal of Operational Research,1997,97(2):380-395
  • 7Park K,Lee K,Park S,et al.Modeling and solving the spatial block scheduling problem in a shipbuilding company.Computers Industry Engineering,1996,30(3):357-364
  • 8Lee K J,Lee J K.A Spatial Scheduling System and its Application to Shipbuilding:DAS-CURVE.Expert System With Application,1996,10(3/4):311-324
  • 9Kim Y K,Kim Y,Kim Y J.Two-sided assembly line balancing:a genetic algorithm approach.Production Planning and Control,2000,11(1):44-53
  • 10段海滨.蚁群算法原理及应用[M].北京:科学出版社,2005.12.

共引文献6

同被引文献16

引证文献2

二级引证文献3

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部