发电机单点接地转子维护 被引量:1

Maintenance of Gas Generator Rotors under One Point Grounding
原文传递
导出
摘要 60MW发电机在运转时报出转子一点接地的故障信息,按规程需及时检查处理,针对此类影响发电机运转的常见问题,剖析了发电机转子的故障诊断和检修过程,重点介绍了检测手段、修理步骤、工装和难点,形成了检修基准,有利于打破检修厂家垄断,消除发电机组同类故障。 The fault information of 60MW generator rotors under one point grounding was reported. According to the procedures ,this problem need to cheek and deal with on time~ Aiming at these problems, this paper analysis the generator rotor fault diagnosis and repair process, focusing on the means of detection and repair steps, tooling and difficulties, forming a maintenance base, breaking the maintenance manufacturers monopoly. providing convenience for the similar fault diagnosis and maintenance of the long period operation.
作者 杨传龙 Yang Chuanlong(Rizhao Iron & Steel Co.,Ltd.,Rizhao 27680)
出处 《冶金设备》 2018年第A01期117-118,112,共3页 Metallurgical Equipment
关键词 发电机 单点接地 维修 Generator One point grounding Maintenance
  • 相关文献

参考文献3

二级参考文献5

共引文献3

同被引文献21

引证文献1

二级引证文献2

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部