解决锌精矿焙烧余热锅炉积灰问题的生产实践

The production practice to solve the problem of ash accumulation in zinc concentrate roasting waste heat boiler
下载PDF
导出
摘要 针对锌精矿焙烧余热锅炉积灰问题,从锌精矿物理性质和化学成分、焙烧工艺控制及余热锅炉结构等三方面进行了原因分析,并制定应对措施予以实施。设置了增湿装置、严格控制焙烧条件并对锅炉结构和清灰装置进行了改造。经过半年的生产实践,改造后的锅炉未发现积灰现象。 Aiming at the problem of ash deposit in waste heat boiler of zinc concentrate roasting, the reasons from three aspects which are the physical properties and chemical composition of zinc concentrate, the control of roasting process and the structure of waste heat boiler are analyzed, and the corresponding measures to be implemented are put forward.The humidifying device is installed , roasting condition is strictly controlled and boiler structure and ash cleaning device are reformed.After half a year s production practice, no dust accumulation is found in the transformed boiler.
作者 何全龙 宁天庆 HE Quanlong;NING Tianqing(Hanzhong Zinc Industry Co.,Ltd.,Hanzhong,Shaanxi,724204,China)
出处 《硫酸工业》 CAS 2018年第10期43-45,共3页 Sulphuric Acid Industry
关键词 锌精矿 余热锅炉 积灰 生产实践 zinc concentrate;waste heat boiler;ash accumulation production practice
  • 相关文献

参考文献4

二级参考文献4

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部