期刊文献+

CL体系在施工过程中混凝土垫块制作的施工工艺 被引量:1

Construction Technology of Concrete Cushion Block Made by CL System During Construction Process
下载PDF
导出
摘要 CL体系可以保证建筑热工性能的稳定,在其施工时,需要混凝土垫块的制作安装以便于后续工序顺利进行。制作混凝土垫块,可以保证钢筋保护层的厚度,又可以与结构更好的结合,保障CL体系的施工质量。 The CL system can ensure the stability of the thermal performance of the building. In its construction, it is necessary to make and install the concrete cushion block so as to facilitate the subsequent process to proceed smoothly. Making concrete padding blocks can guarantee the thickness of the steel bar protection layer, and can combine with the structure better, so as to guarantee the construction quality of the CL system.
作者 张大伟 ZHANG Da-wei(Department of Construction Engineering,Chengde Petroleum College,Chengde 067000,Hebei,China)
出处 《承德石油高等专科学校学报》 CAS 2018年第5期57-58,70,共3页 Journal of Chengde Petroleum College
关键词 CL体系 垫块 模具 CL system padding block mold
  • 相关文献

参考文献3

二级参考文献7

共引文献8

同被引文献3

引证文献1

二级引证文献1

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部