摘要
闽江边某江水源热泵系统取水工程,经方案比选确定采用取水头部取水-潜水泵取水泵房提升-自清洗过滤器过滤-叠片式过滤器过滤的取水系统设计,该系统现已投入使用,并能正常运行达到预期效果。文章基此分别对取水头部、取水泵房、水处理系统以及冲洗系统的设计进行分析。
This paper takes the water intake project of the water source heat pump system on the side of the Minjiang River. The design of the water intake system is determined by scheme comparison,with water intake pump room upgrade,self-cleaning filter and discal filters.The system has been put into use,and able to run properly to achieve the desired results. Based on this,the paper respectively analyzes the design of water intake head,water intake pump room,water treatment system and flushing system.
作者
齐欣
QI Xin(Fujian Provincial Institute of Architectural Design and Research Co.,Ltd.,Fuzhou 350001)
出处
《福建建筑》
2018年第10期83-86,105,共5页
Fujian Architecture & Construction
关键词
闽江
江水源热泵
取水系统
水处理
Minjiang river
River water source heat pump
Water intake system
Water treatment