(100+180+100)m大跨连续刚构桥设计 被引量:3

Design of(100+180+100)m Large Span Continuous Rigid Frame Bridge
下载PDF
导出
摘要 大跨连续刚构桥采用墩梁固结的结构形式,取消了大吨位支座,节省了造价,方便施工,且结构动力性能优异,是大跨度桥梁中十分有竞争力的桥梁类型,在山区跨越深沟大壑或河流时广泛采用。某跨越黄河峡谷的铁路桥梁主桥采用预应力混凝土连续刚构,孔跨布置为(100+180+100) m。主梁采用单箱单室预应力混凝土箱梁,主墩采用薄壁空心桥墩,主墩基础采用明挖满灌基础。采用有限元分析法对主桥进行了整体静力、动力分析计算,并进行了车桥耦合动力分析。结果表明,该桥在施工和运营阶段各项指标均满足相关规范要求,结构安全可靠,具有良好的列车行车安全性和平稳性,动力性能符合要求。可为同类桥梁结构提供参考。 Thanks to the adoption of the consolidated structmre forpier and beam, large tonnage bearing is cancelled for large-span continuous rigid frame bridge, cost is also saved, and a convenient construction could be got. This bridge type is a verey competitive bridge style, and it is verey popular when bridge designer counters deep groove. A main railway bridge across the Yellow River valley adopts prestressed concrete continuous rigid frame type, and its span arrangement is (100 + 180 + 100)m. The upper main girder adopts a single concrete box girder with a single ventricular, the lower main pier adopts thin wall voided pier, and its abutments use open-cut foundation. Static and dynamic analyses and calculations are carried out for the main bridge by finite element analysis, and vehicle-bridge interaction analysis is also conducted. The results indicate that the bridge is safe and reliable, and everey index meet the relevant requirements of codes. It has sound security and riding quality, and the dynamic performances meet requirements. The design of the bridge could provide references for similar structmres.
作者 冯亚成 FENG Yacheng(China Railway First Survey and Design Institute Group Co.,Ltd.,Xi'an 710043,China)
出处 《高速铁路技术》 2018年第5期84-87,92,共5页 High Speed Railway Technology
关键词 铁路桥梁 预应力混凝土 大跨连续刚构 设计 railway bridges prestressed concrete large-span continuous rigid frame design
  • 相关文献

参考文献5

二级参考文献12

共引文献26

同被引文献36

引证文献3

二级引证文献16

相关作者

内容加载中请稍等...

相关机构

内容加载中请稍等...

相关主题

内容加载中请稍等...

浏览历史

内容加载中请稍等...
;
使用帮助 返回顶部